Owner: City of San Luis Obispo
Location: San Luis Obispo, California
Projected Start Date: July 2006
Value: $12,130,858
Construction of 3 MG and 2 MG above grade steel potable water storage tanks and associated piping and appurtenances; renovation of the existing above ground washwater storage tank; construction of a new transfer pump station; modification and conversion of the two existing 8 mgd flocculation basins to two Actiflo process trains including installation of equipment provided by the city; demolition of the washwater reclamation junction box; washwater pumps, transfer pump station and the internal baffles in flocculation basins 1 and 2; installation of 16-inch and 8-inch treated water lines and 24-inch and 20-inch raw water pipelines; sitework, including major excavation, plant pavements replacement and the installation of retaining walls and a new septic tank and leach field; chemical feed systems; heating, ventilating and airconditioning; and electrical, instrumentation and plant control upgrade.