|
Owner: City of Thornton
Location: Thornton, Colorado
Projected Start Date: June 2006
Value: $4,287,000
Construction includes a soil-bentonite cutoff wall around the perimeter of the existing East Sprat Platte gravel pit. A groundwater pump station and relief drain along the eastern and southern perimeter of the site. Also included is the diversion and bypass pumping on the existing Bull Seep Ditch to allow for construction of 3 new flume structures.
Engineer: GEI Consultants

Back to Projects |