Project:
Broomfield Pump Station Modifications
Owner: Denver Water
Location: Thornton, Colorado
Start Date: February 2011
Value: $1,262,000
Scope:
- Replacement of three horizontal split-case centrifugal pumps and motors.
- Refurbishment of underground surge tank and controls.
- Installation of a common check valve in the discharge header.
- Replacement of the manual overhead crane with an electrified crane.
- Electrical service work which includes the demolition of the existing transformer, construction of the concrete containment pads, installation of transformer and outdoor switchgear.
- Work also includes new conduit and wiring from the indoor gear to the transformer/outdoor switchgear and concrete ductbank and wiring.