RIFLE REGIONAL WASTEWATER RECLAMATION FACILITIES |
|
Owner: City of Rifle
Location: Rifle, CO
Projected Start Date: December 2007
Value: $23,200,000
This project encompasses the complete construction of an entirely new 2.0 MGD wastewater treatment facility on undeveloped land. The project includes, site grading, yard piping, 30" interceptor from town, utility extensions, construct and furnish an administration building, construct and equip headworks and RAS/UV process buidlings, construct and equip multiple unit process structures, 30" outfall pipe to Colorado River, landscaping, process control system, abandonment of existing interconnect lift station to South WWTF, and connect existing South WWTF lift station to 6" HDPE forcemain back to new plant.
|
GRAND LAKE LIFT STATION |
|
Owner: Three Lakes Water and Sanitation District
Location: Grand Lake, CO
Projected Start Date: October 2007
Value: $708,500
This contract consists of furnishing all materials, equipment, accessories and labor for performing all operations necessary to complete the pump renovation at Grand Lake Lift Station and in line valve installation at Shadow Mountain and Stillwater Lift Stations, site grading and site piping within the boundaries of the construction site. .
|
LOVELAND HEADWORKS FACILITY IMPROVEMENTS |
|
Owner: The City of Loveland
Location: Loveland, CO
Projected Start Date: October 2007
Value: $5,510,000
Construction consists of modifications to the existing Headworks Buidling, including the addition of screening equipment and screenings processing equipment, replacement of the aerated grit basin with a Vortex Grit Chamber and addition of new grit pump station, new influent pump station using submersible pumps, addition of two stage chemical odor scrubber system and odor collection ductwork, a new biofilter system for treating odors from the plant influent collection manhole, new second standby generator and plant switchgear revisions and all associated site, structural, mechanical, electrical, instrumentation and software programming to complete the project. .
|
| UPPER BLUE AND BIG TOOTH DAM MODIFICATIONS |
|
Owner: Colorado Springs Utilities
Location: Breckenridge, CO
Projected Start Date: June 2007
Value: $3,819,000
Construction consists of improvements and modifications to both dams including installation of geocomposite liners, repairing asphalt cracks, installing gabions, removing and replacing crest parapet wall and constructing a raised ogee spillway crest and raised spillway chute walls. |
|
|
|
| |
| |