Project:
Stilling Basin Discharge Floor Replacement
Owner: Nebraska Public Power District
Location: North Platte, Nebraska
Start Date: January 2009
Value: $522,378
Scope:
- Replacement and repairs of the existing concrete
floor and sidewalls in the spillway of the
outfall for Sutherland Reservoir.
- Dewatering
of the existing discharge barrel including
fish salvage
- Installation of a ground dewatering
system.
- Concrete work includes very flat and
tight concrete surface tolerances to counter
surface scouring.