Project:
Stilling Basin Discharge Floor Replacement

Owner: Nebraska Public Power District
Location: North Platte, Nebraska
Start Date: January 2009
Value: $522,378

Scope:

  • Replacement and repairs of the existing concrete floor and sidewalls in the spillway of the outfall for Sutherland Reservoir.
  • Dewatering of the existing discharge barrel including fish salvage
  • Installation of a ground dewatering system.
  • Concrete work includes very flat and tight concrete surface tolerances to counter surface scouring.

 

 

 